NavyDEP
 

Go Back   NavyDEP > Ratings (Jobs) > Cryptologic/Intelligence (Spooks) > CTN = CRYPTOLOGIC TECHNICIAN NETWORKS

Family Members join our new Facebook group sponsored by NavyDEP: https://www.facebook.com/groups/Rtcgreatlakes


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-22-2015, 11:58 PM   #3
jzhaun
**Active Duty**
 
jzhaun's Avatar
 
Join Date: Jun 2012
Posts: 627
Rep Power: 0
jzhaun has much to be proud ofjzhaun has much to be proud ofjzhaun has much to be proud ofjzhaun has much to be proud of
Default

Quote:
Originally Posted by Haasino View Post
To provide an example... my graduating class from VP-30 was the first week of July... admin being admin, got about half the class' advancement paperwork done at the end of June, and the rest done right before graduation in July. So some of us had a Jan 1st TIR date and got to take the test that following September... while the others had a July 1st TIR date and had to wait until the following March. One of my buddies with the July 1st TIR was able to take the test anyway, but it came back invalid from BUPERS due to insufficient TIR.
Huh, this was not my experience. Admin took months to complete the ATF paperwork, but they backdated all of the advancements to the 16th of the first month we were eligible.
jzhaun is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 05:48 PM.


Powered by vBulletin® Version 3.8.8 Beta 3
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.

vBulletin Optimisation provided by vB Optimise v2.6.0 (Pro) - vBulletin Mods & Addons Copyright © 2026 DragonByte Technologies Ltd.
This site and contents ©2009-2014 NavyFamiles