NavyDEP
 

Go Back   NavyDEP > Ratings (Jobs) > Ratings (Jobs) ~ Seaman > Advanced Electronics Computer Field

Family Members join our new Facebook group sponsored by NavyDEP: https://www.facebook.com/groups/Rtcgreatlakes


Reply
 
Thread Tools Display Modes
Old 05-07-2012, 08:54 PM   #1
blueberripie
Junior Member
 
blueberripie's Avatar
 
Join Date: Mar 2012
Location: Texas
Posts: 45
Rep Power: 11
blueberripie is on a distinguished road
Question AECF total wks in school?

Does anyone know the total weeks for AECF schooling? I'm being told A school can be 9 wks then someone says oh no it's almost a year. Then C school 12 and 17 weeks. Just very frustrating when I keep being told several different time frames.
Thanks
blueberripie is offline   Reply With Quote
Old 05-07-2012, 09:53 PM   #2
Laworlo
Senior Member
 
Join Date: Jan 2012
Location: San Diego, California
Posts: 322
Rep Power: 39
Laworlo is on a distinguished road
Default

I am curious on this as well. I am getting the same info as you and I am very confused.
Laworlo is offline   Reply With Quote
Old 05-08-2012, 09:28 PM   #3
NAtomS
Newbie
 
Join Date: Mar 2011
Posts: 17
Rep Power: 8
NAtomS is on a distinguished road
Default

School for FC's and ET's are different. Depending on your rate youll be in ATT for 17 weeks(ETs) or 19weeks(FCs). After youre done with ATT you move on to 'A' school but might have hold time in between. I think i waited about 2 weeks. When you go to 'A' school i dont remember it in weeks i just know it was from Sept. 21st till Feb. 3rd when i graduated. Since then Ive been on holds waiting for orders. ETs get orders pretty fast but FCs.. be prepared to wait for awhile.
NAtomS is offline   Reply With Quote
Old 05-08-2012, 10:00 PM   #4
Laworlo
Senior Member
 
Join Date: Jan 2012
Location: San Diego, California
Posts: 322
Rep Power: 39
Laworlo is on a distinguished road
Default

What would cause FC's to wait longer than ET's for orders? And while waiting what do you do? Temporary Assignment?
Laworlo is offline   Reply With Quote
Old 05-09-2012, 01:46 PM   #5
NAtomS
Newbie
 
Join Date: Mar 2011
Posts: 17
Rep Power: 8
NAtomS is on a distinguished road
Default

FCs wait longer just because our orders are somewhat backed up. You have a class of 25 or so graduate every friday so just not enough orders for them all. I was lucky and only had to wait about 4 1/2 months. But, while waiting you will be on a holds ship, the USS Cole, and do working parties and do sweepers..alot. For the most part you have a lot of free time,and they have some volunteer opportunies on occasions
NAtomS is offline   Reply With Quote
Old 01-12-2013, 11:50 PM   #6
cakers00
Member
 
Join Date: Dec 2012
Location: Cleveland, TN
Posts: 93
Rep Power: 16
cakers00 is on a distinguished road
Default

It looks like the information on schoolings has been updated as of 10/2012.
ATT training is approx 9 weeks for both FC and ET.
A school for FC is 31 weeks.
A school for ET is 42 weeks.
Attached Files
File Type: pdf aecf.pdf (28.8 KB, 74 views)
cakers00 is offline   Reply With Quote
Old 01-13-2013, 08:15 PM   #7
kate0116
Newbie
 
Join Date: Dec 2012
Location: Michigan
Posts: 8
Rep Power: 7
kate0116 is on a distinguished road
Default

I'm going in as an AECF, and leave on Tuesday. My rating sheet that I got states that you first have an apprenticeship that last 9 weeks, and A school depends on whether or not you take ET or FC. ET is 12 weeks where FC is 17 weeks. As far as C school goes, from what I understand, there are so many sub-categories under ET and FC, and so many different C school locations, etc. that you have to wait to find out where you will be going to C school and the duration of C school. What I do know is that I will be in Great Lakes for ~30 weeks (including boot camp).
From what I've been told and have figured out with ET and FC is that FC is more "elite", but is also out on sea tours more often. Actually, I've heard they're out there a lot. Ultimately, with all the sub-categories and everything else, it just depends on the needs of the navy.
Here's what my rate fact sheet looks like which I got from my recruiter. http://www.cnrc.navy.mil/Graphic-Ele...uter-Field.pdf
I hope that helps.
kate0116 is offline   Reply With Quote
Old 01-13-2013, 08:36 PM   #8
samakb
**Active Duty**
 
Join Date: Jul 2012
Posts: 50
Rep Power: 12
samakb is on a distinguished road
Default

Quote:
Originally Posted by kate0116 View Post
I'm going in as an AECF, and leave on Tuesday. My rating sheet that I got states that you first have an apprenticeship that last 9 weeks, and A school depends on whether or not you take ET or FC. ET is 12 weeks where FC is 17 weeks. As far as C school goes, from what I understand, there are so many sub-categories under ET and FC, and so many different C school locations, etc. that you have to wait to find out where you will be going to C school and the duration of C school. What I do know is that I will be in Great Lakes for ~30 weeks (including boot camp).
From what I've been told and have figured out with ET and FC is that FC is more "elite", but is also out on sea tours more often. Actually, I've heard they're out there a lot. Ultimately, with all the sub-categories and everything else, it just depends on the needs of the navy.
Here's what my rate fact sheet looks like which I got from my recruiter. http://www.cnrc.navy.mil/Graphic-Ele...uter-Field.pdf
I hope that helps.
The info sheet you linked is a bit outdated. Here is the latest info sheet: AECF INFO SHEET

Very different time lengths compared to 2008.
samakb is offline   Reply With Quote
Old 01-13-2013, 09:59 PM   #9
kate0116
Newbie
 
Join Date: Dec 2012
Location: Michigan
Posts: 8
Rep Power: 7
kate0116 is on a distinguished road
Default

Quote:
Originally Posted by samakb View Post
The info sheet you linked is a bit outdated. Here is the latest info sheet: AECF INFO SHEET

Very different time lengths compared to 2008.
That's interesting, because the sheet I linked to has the exact same info as the rate fact sheet I got from my recruiter once I signed when I was switching my rate. And, you're right, that is a BIG difference. I guess I will try and inquire when I check in with my recruiter tomorrrow. Normally I wouldn't care too much, but I have a husband, a 4 year old and 6 year old. Our plans would completely change if that was the new time frame.
kate0116 is offline   Reply With Quote
Old 01-13-2013, 10:50 PM   #10
kforbs126
Senior Member
 
Join Date: Feb 2009
Location: San Diego, Ca
Posts: 944
Rep Power: 127
kforbs126 is just really nicekforbs126 is just really nice
Default

Quote:
Originally Posted by kate0116 View Post
That's interesting, because the sheet I linked to has the exact same info as the rate fact sheet I got from my recruiter once I signed when I was switching my rate. And, you're right, that is a BIG difference. I guess I will try and inquire when I check in with my recruiter tomorrrow. Normally I wouldn't care too much, but I have a husband, a 4 year old and 6 year old. Our plans would completely change if that was the new time frame.
You are going to be in great lakes about 18 months. I just had a guy come from great lakes and he was there about that. He hasn't attended C school yet but will in a month. I was also there for about 18 months.
kforbs126 is offline   Reply With Quote
Old 01-14-2013, 09:08 PM   #11
kate0116
Newbie
 
Join Date: Dec 2012
Location: Michigan
Posts: 8
Rep Power: 7
kate0116 is on a distinguished road
Default

Thanks for the info, that was more helpful then my recruiter was...
kate0116 is offline   Reply With Quote
Old 01-15-2014, 02:21 PM   #12
shamablama
Member
 
Join Date: Jan 2014
Location: Newport News, Virginia
Posts: 85
Rep Power: 14
shamablama is on a distinguished road
Default

Does anyone have the current school lengths for this program? I am leaving on February 18th for AECF… originally I was leaving March 25th for AC, but I wanted the earlier ship date, and both ratings sounded awesome to me. Also, do you actually get to choose your rate or does the Navy assign that to you?
shamablama is offline   Reply With Quote
Old 01-16-2014, 08:21 AM   #13
calie89
Member
 
Join Date: May 2012
Location: Dahlgren, VA
Posts: 70
Rep Power: 14
calie89 is on a distinguished road
Default

As of right now, both of my posts from above are still current, when referring to average time in school (for an FC) I spent a little over a year in Great Lakes (including 7 weeks of boot) I will spend about 8-10 months in C school. Time in C school varies greatly based on which NEC you choose.

As for picking ET vs. FC, you do not pick. You get assigned either one during bootcamp, and will find out which towards the end of boot.
calie89 is offline   Reply With Quote
Old 01-16-2014, 10:36 AM   #14
shamablama
Member
 
Join Date: Jan 2014
Location: Newport News, Virginia
Posts: 85
Rep Power: 14
shamablama is on a distinguished road
Default

Cool, thanks
shamablama is offline   Reply With Quote
Old 02-08-2014, 10:28 AM   #15
Rogers784
Newbie
 
Join Date: Dec 2012
Location: Great Lakes, Il
Posts: 4
Rep Power: 0
Rogers784 is on a distinguished road
Default

The info above was off a bit for FC's

ATT=9weeks
A School= I started mid-late November of 2013 and my class graduates on
04APR14 so its not all that long.
Rogers784 is offline   Reply With Quote
Old 02-08-2014, 01:05 PM   #16
Bahrke
Newbie
 
Join Date: Oct 2012
Location: Dahlgren, VA
Posts: 11
Rep Power: 8
Bahrke is on a distinguished road
Default My experience

Whats up guys, Haven't been on for awhile. Thought I'd I'd stop by to throw in my 2 cents on the AECF training pipeline. I left for bootcamp 11Dec12 , graduated 08Feb14 ( Year ago today ) .. Once I crossed the street to Great Lakes I had to wait almost 2 months before I even started ATT. This was really common at that point in time.. ATT was just about 10 weeks for us. I'll say it now FOCUS on what you are learning. It's crucial to understanding your job as a whole and passing advancement tests. After ATT I waited a week and started A-School that lasted I believe around 11 weeks. I graduated around the 25th of September 2013. I was then put on the usual hold before C-School for all FC's for 3.5 months, and reported to Dahlgren, Virginia on 06Jan14 and started class for FCS/400Hz on 13Jan14. I am set to graduate 11Jul14 .. Good part is I get to take the E5 exam in March.. without my Aegis NEC .. (Better quota). Hope this helped! Got any questions about the rate, Great Lakes, anything at all please e-mail me at cody.bahrke@gmail.com!

FC3 Bahrke
Bahrke is offline   Reply With Quote
Old 07-14-2014, 06:02 AM   #17
USNavyFrank
Junior Member
 
USNavyFrank's Avatar
 
Join Date: Apr 2014
Location: Tampa, FL
Posts: 34
Rep Power: 9
USNavyFrank is on a distinguished road
Default

It's so confusing how these numbers vary so greatly between sources. I guess I'll just find out when I get there, then I can share my own experience on this thread. I'll graduate boot camp in early November. Looking forward to contributing and SO EXCITED to be AECF!
__________________
"There is no knowledge that is not power."

RATE: AECF
DEP: 20140709
SHIP: 20140904
USNavyFrank is offline   Reply With Quote
Old 07-21-2014, 10:57 PM   #18
cgreene89
Newbie
 
Join Date: Jun 2014
Posts: 12
Rep Power: 7
cgreene89 is on a distinguished road
Default

talked to a girl at my recruiters office who is on hold for C school as an FC. She said that A school for the FC is 15 weeks. ET A school is 19 weeks. And the ATT school is about 10 weeks for each rating.
cgreene89 is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 09:50 AM.


Powered by vBulletin® Version 3.8.8 Beta 3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

vBulletin Optimisation provided by vB Optimise v2.6.0 (Pro) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
This site and contents ©2009-2014 NavyFamiles